ESP is currently designing a 3.2-mile paved, ADA-accessible greenway trail within the McDowell Creek Greenway corridor to expand the existing greenway west from Beatties Ford Road to Gilead Road, along with connections to six adjacent neighborhoods. Plans for this 12-foot-wide greenway path include two pedestrian bridges, nine boardwalks, three concrete overlooks, and a trailhead with 60 parking spaces.
As part of the overall project, our team will be focused on providing connectivity to adjacent neighborhoods along the corridor and coordinating with the preservation of a historic grist mill site. The project area includes stream crossings, a riparian buffer corridor within a FEMA floodplain, and coordination with a future CLTWater sewer trunk line upgrade project.
Mecklenburg County
Huntersville, NC
3.2 miles
In Progress
We strive to be a partner in our clients’ success with one simple approach – Listen. Deliver. Improve.
Corporate Headquarters